已收录 271559 条政策
 政策提纲
  • 暂无提纲
Remedial investigation/feasibility study work plan for selected sites at Yuma Proving Ground, Arizona.
[摘要] This document presents the Remedial Investigation/Feasibility Study (RI/FS) Work Plan for the contaminant characterization efforts to be conducted as part of the Resource Conservation and Recovery Act (RCRA) corrective action involving selected sites (e.g., solid waste management units (SWMUs)) at Yuma Proving Ground (YPG), Arizona. The RCRA corrective action will be conducted under the direction of YPG in coordination with the State of Arizona, Department of Environmental Quality (ADEQ). As directed by the ADEQ, and in agreement with YPG, the investigation and restoration of the selected sites will follow the format established under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the National Contingency Plan (40 Code of Federal Regulations (CFR) Part 300). A remedial investigation (RI) will be performed and will be followed by a feasibility study (FS) if it is determined that conditions at specific sites warrant additional action (e.g., remediation). The RI/FS will be conducted in compliance with policies and procedures established under the US Army Environmental Center (AEC) Installation Restoration Program (IRP) and related programs.
[发布日期]  [发布机构] Technical Information Center Oak Ridge Tennessee
[效力级别]  [学科分类] 工程和技术(综合)
[关键词] Environmental quality;Resource conservation;Arizona;Compliance;Management [时效性] 
   浏览次数:26      统一登录查看全文      激活码登录查看全文