已收录 268920 条政策
 政策提纲
  • 暂无提纲
Gas/Liquid Membranes for natural Gas Upgrading. Quarter Report No. 9.
[摘要] Efforts this quarter have concentrated on field site selection. ChevronTexaco has signed a contract with Kvaerner process Systems for the 50 MM scf/d dehydration skid at their Headlee Gas Plant in Odessa, TX for a commercial-scale test. This will allow the test to go forth. A new test schedule was established with testing beyond the existing contract completion date. Potting and module materials testing continued. Construction of the bench-scale equipment was started. Additional funding to support the test was obtained through a contract with Research Partnership for Secure Energy for America.
[发布日期]  [发布机构] Technical Information Center Oak Ridge Tennessee
[效力级别]  [学科分类] 工程和技术(综合)
[关键词] Natural gas;Site selection;Membranes;Construction;Dehydration [时效性] 
   浏览次数:40      统一登录查看全文      激活码登录查看全文