已收录 273502 条政策
 政策提纲
  • 暂无提纲
NWCC Transmission Case Studies Conclusions Summary: Opportunities for Wind in RTO Development Processes.
[摘要] In the spring of 1999, the Utility Wind Interest Group (UWIG), with the cooperation of the National Wind Coordinating Committee (NWCC), conducted a forum on transmission issues associated with the production of energy from wind. As a result of this forum, a number of issues were identified which, if successfully resolved, could help reduce barriers to the future expansion of wind power. The NWCC, being a multi-stakeholder group, was in an ideal position to conduct follow-up activities among a cross-section of the interested parties. The follow-up activities took the form of three case studies in the areas of interest identified by forum participants: (1) Transmission policy and pricing; (2) 'Virtual wheeling' arrangements; and, (3) Transmission system improvements. The case studies provide an interesting snapshot in time dealing with a range of issues associated with scheduled or planned regulatory and restructuring proceedings related to energy transmission. The NWCC Transmission Subcommittee and the UWIG reviewed early drafts of the case studies in November 1999. The case studies were conducted through a questionnaire and interview process with interested parties. In writing each case study, NWCC staff attempted to identify all stakeholder groups with an interest in each topic and solicit their input. While all parties do not agree on every issue presented, a serious effort has been made to present all views in an unbiased fashion. At the end of each case study, relevant conclusions are drawn and recommendations for next steps are provided where appropriate.
[发布日期]  [发布机构] Technical Information Center Oak Ridge Tennessee
[效力级别]  [学科分类] 工程和技术(综合)
[关键词] Wind power;Case studies;Questionnaires;Interviews;Impacts [时效性] 
   浏览次数:61      统一登录查看全文      激活码登录查看全文