Facility Effluent Monitoring Plan for the Spent Nuclear Project.
[摘要] A facility effluent monitoring plan is required by the US. Deparment of Energy in DOE Order 5400. I(1) for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in Westinghouse Hanford Company (WHC)-EP-0438-I(2), A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. 7% facility effluent monitoring plan is the third revision to the original annual report. This document is reviewed annually even if there are no operational changes and it is updated as necessary.
[发布日期] [发布机构] Technical Information Center Oak Ridge Tennessee
[效力级别] [学科分类] 工程和技术(综合)
[关键词] Nuclear fuels;Public health;Effluents;Guidelines;Occupational safety and health [时效性]