Towards Revised Step IV MICE Optics in the Absence of M1 SSD
[摘要] During magnet commissioning in September 2015, the leads on coil M1 of the downstream spectrometer solenoid failed. The coil will not be operational for MICE Step IV. Revised optics settings for the Step IV data taking are reviewed.
[发布日期] 2015-10-01 [发布机构]
[效力级别] [学科分类] 核物理和高能物理
[关键词] SOLENOIDS;BEAM OPTICS;MAGNET COILS;SPECTROMETERS;FAILURES;FERMILAB;CORRECTIONS [时效性]