已收录 273176 条政策
 政策提纲
  • 暂无提纲
Run 16, eIPM Summary
[摘要] We corrected three problems with the eIPMs during the summer shutdown. We installed new amplifiers for Run 15. These were charge-??sensitive amps designed to integrate over the 200ns-??long injected bunches and decay to baseline in one full revolution period, ~2.7us. The input stage was built on a small circuit board which replaced the fast pulse amplifiers used originally in RHIC. We used the existing output drivers on the carrier board which were transformer-??coupled to the twisted-??pair signal lines leaving the tunnel. With AC coupling, there could be no DC component in the output signal. When the digitizers were triggered on the beam pulse we got good profiles, left. When we moved the trigger point we got 'inverted profiles' from the undershoot, right. In these two examples the trigger signal timing is different by 70?�� at harmonic number 1.
[发布日期] 2016-08-05 [发布机构] 
[效力级别]  [学科分类] 核物理和高能物理
[关键词] Alternating Gradient Synchrotron [时效性] 
   浏览次数:24      统一登录查看全文      激活码登录查看全文