The authors present the conceptual design, structural detailing, fabrication and erection challenges faced during the 36-month fasttrack design and construction of this $130 million multipurpose arena in Cleveland, Ohio. A key ingredient in the success of this project was the close coordination that was required between the precast concrete contractor and the design team to complete the precast, prestressed concrete stadia seats and intricately articulated exterior facade - all accomplished within a limited time frame and tight budget.